TM 5-3805-261-20HYDRAULIC SYSTEM MAINTENANCE. (cont)15-24.BladeLiftLines,FittingsandHoses.(Sheet 10 of 10)INSTALLATION (cont)30.Connect two hose assemblies (8,Figure 15-79) to right control valve group.31.Connect two hose assemblies. Refer toparagraph 15-33, steps11 and 10.WARNINGOnly a qualified operator mayperform the next procedure. All otherpersonnel must clear the immediatearea. Failure to follow this proceduremay cause INJURY. If you areinjured, seek medical aidimmediately.32.Start engine. Refer to TM 5-3805-261-10.33.Operate left and right blade lift controls.Move system through at least five fullmovements of travel to bleed air fromsystem.34.Stop engine.35.Inspect hose assemblies and connectionsfor leaks.36.Refill hydraulic tank to proper level. Referto LO 5-3805-261-12.NOTEReturn 130G Grader to originalequipment condition.Figure 15-79.End of Task15-125
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business