TM 5-3805-261-20HYDRAULIC SYSTEM MAINTENANCE.15-24.BladeLiftLines,FittingsandHoses.(Sheet 6 of 10)CLEANINGClean all parts. Refer to Chapter 2.INSPECTIONInspect all parts. Refer to Chapter 2.INSTALLATION1.Install new preformed packing (60) andconnector (59, Figure 15-92).2.Install hose assembly (58) on bottom of leftblade lift cylinder.3.Install new preformed packing (57) andconnector (56).4.Install hose assembly (55) on top of leftblade lift cylinder.5.Install bolt (54), washer (53), clamp (52),spacer (51), two clips (50), washer (49) andnut (48) on left blade lift cylinder.6.Install tees (47 and 46, Figure 15-91).7.Connect hose assemblies (58 and 55) totees (47 and 46).8.Install two hose assemblies (45) on tees (47and 46).9.Install two new preformed packings (44)and connectors (43).10.Connect two hose assemblies (45) to leftvalve.Go to Sheet 715-121