TM 5-3805-261-20HYDRAULIC SYSTEM MAINTENANCE. (cont)15-24.BladeLiftLines,FittingsandHoses.(Sheet 8 of 10)INSTALLATION (cont)15.Connect two hose assemblies (38, Figure15-86) to left control valve group.16.Install new preformed packing (30) andconnector (29, Figure 15-85).17.Install hose assembly (28) on bottom ofright blade lift cylinder.18.Install new preformed packing (27) andconnector (26).19.Install hose assembly (25) on top of rightblade lift cylinder.20.Install bolt (24), washer (23), clamp (22),spacer (21), two clips (20), washer (19) andnut (18).21.Install tees (17 and 16, Figure 15-84).22.Connect hose assemblies (28 and 25) totees (17 and 16).23.Install two hose assemblies (15) on tees (17and 16).24.Install two new preformed packings (14)and connectors (13).25.Connect two hose assemblies (15) on rightvalve.Figure 15-86.Figure 15-85.Figure 15-84.Go to Sheet 915-123
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business