TM 5-3805-293-23-5
0325
INSTALLATION CONTINUED
6. Install two bolts (Figure 7, Item 2), washers (Figure 7, Item 3), and new locknuts (Figure 7, Item 4) on drawbar
(Figure 7, Item 1) and scarifier (Figure 7, Item 5). Torque bolts to 960 110 lb-ft (1301 110 Nm).
7. Remove sling and lifting device from drawbar.
Figure 7. Drawbar to Scarifier.
0325
8. Repeat steps 2 through 7 for left drawbar.
END OF TASK
FOLLOW-ON TASKS
000325
1. Replace scarifier teeth (TM 5-3805-293-10).
3. Remove articulation lock pin (TM 5-3805-293-10).
END OF TASK
END OF WORK PACKAGE