TM 5-3805-293-23-4
0245
REMOVAL CONTINUED
000245
N OT E
Tag lines to aid in installation.
27. Remove 10 implement control lines (Figure 7, Item 8), implement control hose (Figure 7, Item 10), and 11 O-
rings (Figure 7, Item 9) from front valve bank (Figure 7, Item 1). Discard O-rings.
28. Remove right return line (Figure 7, Item 15) and O-ring (Figure 7, Item 14) from front valve bank (Figure 7,
Item 1). Discard O-ring.
29. Remove left return line (Figure 7, Item 6) and O-ring (Figure 7, Item 7) from front valve bank (Figure 7, Item 1).
Discard O-ring.
30. Remove pilot/load sense line (Figure 7, Item 2) and O-ring (Figure 7, Item 3) from front valve bank (Figure 7,
Item 1). Discard O-ring.
31. Remove pump pressure line (Figure 7, Item 4) from front valve bank (Figure 7, Item 1).
32. Remove pilot/shutoff pressure line (Figure 7, Item 5) from front valve bank (Figure 7, Item 1).
33. Remove 10 tiedown straps (Figure 7, Item 11) from harness (Figure 7, Item 12). Discard tiedown straps.
34. Disconnect 12 harness connectors (Figure 7, Item 13) from front valve bank (Figure 7, Item 1).
35. Remove bolt (Figure 7, Item 16) and washer (Figure 7, Item 17) from pipe cover plate (Figure 7, Item 18).
Figure 7. Hydraulic Lines.
0245
Change 1