TM 5-3805-293-23-4
0245
ASSEMBLY
000245
N OT E
The assembly procedure is the same for each valve.
1. Install new gasket (Figure 12, Item 4) and valve (Figure 12, Item 5) on front valve bank (Figure 12, Item 3).
2. Install new gasket (Figure 12, Item 6), new O-ring (Figure 12, Item 7), and plug (Figure 12, Item 8) on valve
(Figure 12, Item 5).
3. Install end cap (Figure 12, Item 9), four studs (Figure 12, Item 10), washers (Figure 12, Item 11), and nuts
(Figure 12, Item 12) on front valve bank (Figure 12, Item 3). Torque bolt to 41 7 lb-ft (55 9 Nm).
4. Install three new O-rings (Figure 12, Item 13), solenoid (Figure 12, Item 14) and bolt (Figure 12, Item 15) on
valve (Figure 12, Item 5). Torque bolt to 108 lb-ft (147 Nm).
C AU T I O N
Do not adjust check valve; check valve is preset from factory. Adjusting check valve could
result in damage to equipment.
N OT E
The procedure for check valve and solenoid assembly is the same for all valves.
Change 1
0245-12