TM 5-3805-261-34
TRANSMISSION MAINTENANCE. (cont)
14-2.
Transmission Assembly. (Sheet 16 of 20)
ASSEMBLY (cont)
45.
Heat roller bearings (33 and 32,
Figure 14-8) in engine oil SAE 30
to temperature of 275 degrees F.
46.
Install roller bearings (33 and
32) on gear (34).
47.
Install items 34 thru 32 as an
assembly (Figure 14-7).
48.
Install two 3/8-16NC forged
eyebolts in cover (28, Figure
14-27).
49.
Attach hoist and sling.
50.
Install new preformed packings
(31, 29 and 30) on cover (28).
51.
Install cover (28) on trans-
mission housing.
NOTE
Dowel pin in idler gear shaft
must be in alinement with
groove slot in bottom of
cover.
52.
Install twelve lockwashers (25)
and bolts (24) on cover (28).
53.
Install two new preformed
packings (27) and plugs (26).
Go to Sheet 17
Figure 14-8.
Figure 14-7.
Figure 14-27.
14-18