TM 5-3805-261-34
TRANSMISSION MAINTENANCE.
14-3.
Planetary Group. (Sheet 1 of 6)
This task covers:
a.
Removal
b.
Cleaning
c.
Inspection
d.
Installation
INITIAL SETUP:
Applicable Configurations
Personnel Required
All
Construction equipment
repairer MOS 62B
Tools
General Mechanics Tool Kit:
References
Automotive (NSN 5180-00-
TM 5-3805-261-10
177-7033)
Hoist and sling
Special Environmental Conditions
Repair stand 1P2426
None
Two 1/2-13NC eyebolts and nuts
Two 5/8-11NC eyebolts
General Safety Instructions
None
Test Equipment
None
Torques
All fasteners are tightened to
Materials/Parts
standard torques. Refer to
Dry cleaning solvent,
Appendix E.
Item 15, Appendix C
Clean cloths, Item 41,
Appendix C
Preformed packings, Items 3,
9, 10, 11, 12, 13
Troubleshooting References
None
Equipment Condition
TM 5-3805-261-10
Vehicle parked on level ground.
Parking/emergency brake applied.
Equipment lowered to the ground.
Engine stopped.
Master disconnect switch off.
Paragraph 5-6
Transmission removed from vehicle.
Go to Sheet 2
14-23