TM 5-3805-261-34TRANSMISSION MAINTENANCE. (cont)14-2.TransmissionAssembly. (Sheet 18 of 20)ASSEMBLY (cont)62.Install 5/8-11NC x 6 bolt throughhole in one of two bearing cages(16, Figure 14-30).63.Install dial test indicatorgroup.64.Pry under transfer gear (74) witha crowfoot bar to check endclearance. End clearance must be.002 to .006 inch. Add or removeshim(s) from shim pack (17) toget correct end clearancereading.65.Remove dial test indicator.66.Remove 5/8-11NC x 6 bolt.67.Check end clearance in remainingset of items 84 thru 55 as anassembly. Repeat steps 62 thru66.68.Install two new preformedpackings (16) and plugs (15,Figure 14-31).69.Using dry ice, lower temperatureof bearing cup (23).70.Install bearing cup (23) inbearing cage (21).71.Install shim pack (22).72.Install bearing cage (21) oncover (28).73.Install six washers (20) andbolts (19). Tighten six bolts(19) evenly.Go to Sheet 19Figure 14-30.Figure 14-31.14-20
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business