TM 5-3805-261-34FRAME MAINTENANCE.16-2. FrameSeparationandConnection.(Sheet 9 of 12)INSTALLATION7. Install four lockwashers (39) andbolts (38, Figure 16-9). Crosstighten four bolts (38) to 75ft-lb torque. Tighten one offour bolts (38) to 75 ft-lbtorque. Tighten one of fourbolts (38) in the upper rightcorner of plate (42), thentighten the next of four bolts(38) in the lower left corner.Tighten two remaining of fourbolts (38).8. Position pin (50, Figure 16-18).NOTEUse two 5/8-11NC x 6 bolts tokeep holes in bottom of pinin alinement with holes inplate.9. Install two 5/8-11NC x 6 bolts,through plate (48) and into pin(50, Figure 16-19).10. Install pin (50) completely.11. Remove two 5/8-11NC x 6 bolts.12. Remove six bolts (46), lock-washers (47) and plate (48,Figure 16-20).13. Install four lockwashers (45),bolts (44) and plate (48).Tighten four bolts (44) to 100ft-lb torque.Go to Sheet 1016-11Figure 16-20.Figure 16-19.Figure 16-18.Figure 16-9.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business