TM 5-3805-261-34
FRAME MAINTENANCE.
16-3.
Articulation Hitch Bearing. (Sheet 1 of 7)
This task covers:
a.
Removal
b.
Cleaning
c.
Inspection
d.
Installation
INITIAL SETUP:
Applicable Configurations
Personnel Required
All
Two construction equipment
repairers MOS 62B
Tools
General Mechanics Tool Kit:
References
Automotive (NSN 5180-00-
TM 5-3805-261-10
177-7033)
LO 5-3805-261-12
Pulling adapter 1P1837
Stud 5P4184
Pump group 5P3100
Special Environmental Conditions
Puller assembly 5H9817
None
Washer 3H467
Nut 7B7539
General Safety Instructions
Pulling adapter 1P1838
None
Bolt S1602
Adapter 8B7555
Torques
Puller group 1S4233
Except for special torques shown,
Ring installer 2P5498
all fasteners are tightened to
Chilling device to chill
standard torques. Refer to
bearings
Appendix E.
Heavy gloves and tongs
Floor jack
Test Equipment
None
Materials/Parts
Dry cleaning solvent,
Item 15, Appendix C
Clean cloths, Item 41,
Appendix C
Grease, Item 25, Appendix C
Small tags, Item 43, Appendix C
Bearings, Items 12, 14
Seals, Items 6, 10, 13
Dry ice
Go to Sheet 2
16-15