TM 5-3805-261-34FRAME MAINTENANCE. (cont)16-2. FrameSeparationandConnection.(Sheet 8 of 12 )INSTALLATION1. Position forklift under rearframe and remove jack stands.2. Apply shop air supply line toelbow on parking brake actuator(Figure 16-15) and releaseparking brake.3. Move rear frame (53) intoposition on front frame (54,Figure 16-16) using forklift.4. Using forklift to lift or lowerrear frame (53) and a hydraulicjack to move it from side toside, aline bottom pin bore ofrear frame (53) with pin bore offront frame (54).NOTEInstall plate to hold spacerin place.5. Install spacer (51), plate (48),six bolts (46) and lockwashers(47, Figure 16-17).NOTEUsing dry ice, lower temperatureof pin to -90 degrees Fto aid in installation.6. Install pin (43), plate (42), twolockwashers (41) and bolts (40,Figure 16-11).Go to Sheet 916-10Figure 16-15.Figure 16-16.Figure 16-17.Figure 16-11.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business