TM 5-3805-293-23-5
0298
INSTALLATION CONTINUED
8. Install bottom isolator (Figure 5, Item 4), washer (Figure 5, Item 2), and bolt (Figure 5, Item 3) on front cab
mount (Figure 5, Item 1).
9. Remove lifting device and sling from top of cab.
10. Torque front and rear cab mount bolts to 580 lb-ft (786 Nm).
Figure 5. Front Cab Mount.
0298
END OF TASK
FOLLOW-ON TASKS
000298
Install fuel tanks (WP 0229).
END OF TASK
END OF WORK PACKAGE