TM 5-3805-293-23-4
0246
INSTALLATION CONTINUED
4. Using lifting device, install rear valve bank (Figure 12, Item 6) on bracket (Figure 12, Item 10).
5. Install four washers (Figure 12, Item 2) and bolts (Figure 12, Item 1) on rear valve bank (Figure 12, Item 6).
Hand tighten only.
6. Remove sling and lifting device from rear valve bank (Figure 12, Item 6).
7. Remove bolt (Figure 12, Item 4), washer (Figure 12, Item 5) and lifting link bracket (Figure 12, Item 3) from
rear valve bank (Figure 12, Item 6).
8. Remove nut (Figure 12, Item 8), washer (Figure 12, Item 9), and lifting link bracket (Figure 12, Item 7) from
rear valve bank (Figure 12, Item 6).
9. Install washer (Figure 12, Item 9) and nut (Figure 12, Item 8) on rear valve bank (Figure 12, Item 6). Torque
bolts to 41 7 lb-ft (55 9 Nm).
Figure 12. Rear Valve Bank.
0246