TM 5-3805-293-23-4
0245
INSTALLATION CONTINUED
4. Install two new O-rings (Figure 14, Item 1) on front valve bank (Figure 14, Item 6).
5. Using lifting device, position front valve bank (Figure 14, Item 6) and front valve bank mounting plate
(Figure 14, Item 4) on front frame (Figure 14, Item 5).
6. Using lifting device, install front valve bank (Figure 14, Item 6) and front valve bank mounting plate (Figure 14,
Item 4) on front frame (Figure 14, Item 5). Remove front sling from front valve bank.
7. Install four washers (Figure 14, Item 3) and bolts (Figure 14, Item 2) on front valve bank (Figure 14, Item 6).
8. Remove sling and lifting device from front valve bank mounting plate (Figure 14, Item 6).
Figure 14. Front Valve Bank.
0245
Change 1