TM 5-3805-293-23-4
0245
INSTALLATION
000245
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure any lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device. Failure
to follow this warning may result in injury or death to personnel.
N OT E
Front valve bank weighs approximately 160 lb (73 kg).
1. Install front valve bank (Figure 13, Item 1), four washers (Figure 13, Item 3), and bolts (Figure 13, Item 4) on
mounting plate (Figure 13, Item 2).
2. Install two link brackets (Figure 13, Item 5), washers (Figure 13, Item 6), and bolts (Figure 13, Item 7) on front
valve bank mounting plate (Figure 13, Item 2).
3. Attach two slings and lifting device to front valve bank mounting plate (Figure 13, Item 2).
0245
Change 1