TM 5-3805-293-23-3
0044
BRAKE ACCUMULATOR SERVICE TEST AND CHARGE CONTINUED
42. Close nitrogen cylinder valve (Figure 61, Item 3) on nitrogen cylinder (Figure 61, Item 5).
43. Turn vent valve (Figure 61, Item 1) counterclockwise to bleed off pressure until gauge on left (Figure 61,
Item 2) indicates 0 psi (0 kPa).
44. Turn vent valve (Figure 61, Item 1) clockwise to close valve.
45. Disconnect regulator nut (Figure 61, Item 3) from nitrogen release valve (Figure 61, Item 4).
Figure 61. Nitrogen Bottle Venting.
0044