TM 5-3805-261-34ENGINE MAINTENANCE.3-4.Engine.(Sheet 13 of 13)INSTALLATION38.Install cable assemblies (13 and12), lockwasher (11), cableassembly (10), lockwasher (9) andnut (8, Figure 3-4) to startingmotor. Tighten nut (8) to 22ft-lb torque.39.Install cable assemblies (7 and6), wire assembly (5), lockwasher(4) and nut (3) to solenoid"battery" terminal. Tighten nut(3) to 22 ft-lb torque.40.Install wire assembly (2) atterminal and nut (1) on "S"terminal of solenoid (9).41.Turn fuel shutoff valve counterclock-wise on right front of fuel tank tourn fuel on (Figure 3-3).42.Refill engine oil crankcase toproper level. Refer to LO 5-3805-261-12.43.Refill radiator to proper level.Refer to paragraph 6-48 in TM 53805-261-20.44.Bleed air out of fuel lines.Refer to paragraph 6-15 in TM5-3805-261-20.Refer to paragraph 6-15 in TM 5-3805-261-20.NOTEReturn 130G Grader tooriginal equipment condition.End of TaskFigure 3-3.3-29
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business