TM 5-3805-261-20HYDRAULIC SYSTEM MAINTENANCE.15-28.CentershiftLines,FittingsandHoses.(Sheet 7 of 7)INSTALLATION12.Install two new preformed packings (2) andelbows (1, Figure 15-122) to right controlvalve group.13.Connect two hose assemblies (9, Figure15-121) to right control valve group.14.Connect two hose assemblies. Refer toparagraph 15-29, steps 16 and 17.WARNINGOnly a qualified operator mayperform the next procedure. All otherpersonnel must clear the immediatearea. Failure to follow this proceduremay cause INJURY. If you areinjured, seek medical aidimmediately.15.Start engine. Refer to TM 5-3805-261-10.16.Stop engine.17.Inspect hose assemblies and connectionsfor leaks.18.Refill hydraulic tank to proper level. Referto LO 5-3805-261-12.NOTEReturn 130G Grader to originalequipment condition.Figure 15-122.Figure 15-121.End of Task15-155
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business