TM 5-3805-261-20HYDRAULIC SYSTEM MAINTENANCE.15-28.CentershiftLines,FittingsandHoses.(Sheet 3 of 7)REMOVAL6.Remove two hose assemblies (9),connectors (10) and preformed packings(11, Figure 15-125) from top of centershiftcheck valve. Discard two preformedpackings (11).7.Disconnect two hose assemblies (36 and39) and remove items 12 thru 15 (Figure15-126) from bottom of centershift checkvalve. Refer to paragraph 15-13, steps 5 -7.8.Remove two bolts (16), washers (17),plates (18) and clamps (19, Figure 15-127).9.Remove bolt (20), washer (21), clamp (22),bolt (23), washer (24) and clamp (25, Figure15-128).Figure 15-127.Figure 15-125.Figure 15-126.Figure 15-128.Go to Sheet 415-151
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business