TM 5-3805-261-20
HYDRAULIC SYSTEM MAINTENANCE. (cont)
15-28.
Centershift Lines, Fittings and Hoses. (Sheet 6 of 7)
INSTALLATION (cont)
8.
Install items 15 thru 12 and connect two
hose assemblies (39 and 36, Figure 15-
126) to bottom of centershift check valve.
Refer to paragraph 15-13, steps 2 thru 4.
9.
Install two new preformed packings (11),
connectors (10) and hose assemblies (9,
Figure 15-125) to top of centershift check
valve.
10.
Install two clamps (8), washers (7) and bolts
(6, Figure 15-124).
11.
Install two clamps (5), washers (4) and bolts
(3, Figure 15-123).
Figure 15-124.
Figure 15-126.
Figure 15-125.
Figure 15-123.
Go to Sheet 7
15-154