TM 5-3805-261-20
HYDRAULIC SYSTEM MAINTENANCE. (cont)
15-29.
Articulation Lines, Fittings and Hoses. (Sheet 5 of 7)
INSTALLATION (cont)
4.
Install
new
preformed
packing
(35),
connector (34), new preformed packing (33)
and connector (32, Figure 15-135) to
articulation cylinder under right side of
engine compartment.
5.
Install hose assemblies (31 and 30).
6.
Install two new preformed packings (29),
fittings (28) and elbows (27) to centering
valve (46, Figure 15-134) under right rear
side of cab.
7.
Connect hose assemblies (40 and 39).
8.
Install two new preformed packings (26),
fittings (25) and elbows (24) to centering
valve (46) on front side.
9.
Connect hose assemblies (31 and 30).
10.
Install new preformed packing (23), fitting
(22), elbow (21), new preformed packing
(20), fitting (19) and elbow (18) to centering
valve (46).
11.
Install hose assemblies (17 and 16).
12.
Install new preformed packing (15), fitting
(14), elbow (13), new preformed packing
(12) and fitting (11) to articulation check
valve (45, Figure 15-133).
13.
Connect hose assemblies (17 and
16).
Figure 15-135.
Figure 15-134.
Figure 15-133.
Go to Sheet 6
15-160