TM 5-3805-261-20
HYDRAULIC SYSTEM MAINTENANCE.
15-23.
Blade Float Lines, Fittings and Hoses. (Sheet 5 of 5)
INSTALLATION
10.
Install
new
preformed
packing
(10),
connector (9) and tee (8, Figure 15-75) to
control valve group.
11.
Connect hose assemblies (34 and 7).
12.
Install new preformed packing (6) and
elbow (5, Figure 15-74).
13.
Install new preformed packing (4) and
elbow (3).
14.
Install hose assemblies (2 and 1).
WARNING
Only
a
qualified
operator
may
perform the next procedure. All other
personnel must clear the immediate
area. Failure to follow this procedure
may cause INJURY. If you are
injured,
seek
medical
aid
immediately.
15.
Start engine. Refer to TM 5-3805-261-10.
16.
Inspect hose assemblies and connections
for leaks.
17.
Refill hydraulic tank to proper level. Refer
to LO 5-3805-261-12.
NOTE
Return
130G
Grader
to
original
equipment condition.
Figure 15-75.
Figure 15-74.
End of Task
15-115