TM 5-3805-261-20
HYDRAULIC SYSTEM MAINTENANCE. (cont)
15-23.
Blade Float Lines, Fittings and Hoses. (Sheet 4 of 5)
INSTALLATION
1.
Install new preformed packing (36), elbow
(35) and hose assembly (34, Figure 15-78)
to left side valve.
2.
Install new preformed packing (33), elbow
(32) and hose assembly (31) to right side
valve.
3.
Install clip (30) and bolt (29).
4.
Install two spacers (28), clamps (27),
washers (26) and bolts (25).
5.
Install new preformed packing (24), elbow
(23) and hose assembly (22, Figure 15-77).
6.
Install new preformed packing (21), elbow
(20) and hose assembly (19).
7.
Install two spacers (18), clamps (17),
washers (16) and bolts (15).
8.
Install
new
preformed
packing
(14),
connector (13) and tee (12, Figure 15-76) to
control valve group.
9.
Connect hose assemblies (22 and 11).
Figure 15-78.
Figure 15-77.
Figure 15-76.
Go to Sheet 5
15-114