TM 5-3805-261-20HYDRAULIC SYSTEM MAINTENANCE. (cont)15-23.BladeFloatLines,FittingsandHoses.(Sheet 4 of 5)INSTALLATION1.Install new preformed packing (36), elbow(35) and hose assembly (34, Figure 15-78)to left side valve.2.Install new preformed packing (33), elbow(32) and hose assembly (31) to right sidevalve.3.Install clip (30) and bolt (29).4.Install two spacers (28), clamps (27),washers (26) and bolts (25).5.Install new preformed packing (24), elbow(23) and hose assembly (22, Figure 15-77).6.Install new preformed packing (21), elbow(20) and hose assembly (19).7.Install two spacers (18), clamps (17),washers (16) and bolts (15).8.Install new preformed packing (14),connector (13) and tee (12, Figure 15-76) tocontrol valve group.9.Connect hose assemblies (22 and 11).Figure 15-78.Figure 15-77.Figure 15-76.Go to Sheet 515-114
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business