14
TM 5-3805-293-23-5
FIELD MAINTENANCE
-
LIFT ARM REPLACEMENT
0
323
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Tools and Special Tools
Materials/Parts - Continued
0
0
Tool Kit, General Mechanic's
Locknut (8)
0
Lockwasher
0
0
Personnel Required
0
0
Two
Multiplier, Torque (S0253)
0
0
References
0
0
0
Socket, Impact Wrench, 3/4" Dr, 6 pt, 1-1/2"
Equipment Condition
0
0
Socket, Impact Wrench, 3/4" Dr, 6 pt, 1-5/16"
Machine parked (TM 5-3805-293-10)
0
0
Articulation lock pin installed
Socket, Impact Wrench, 3/4" Dr, 6 pt, 1-7/16"
(TM 5-3805-293-10)
0
0
Drawings Required
Wrench, Torque, Click, Ratcheting, 3/4" Drive,
0
TM 5-3805-293-24P, Figure 165
0
0
Lifting device (700-lb [318-kg]
Estimated Time to Complete
minimum capacity)
0
0
4.5 Hr
0
Materials/Parts
0
0
0
0323-1