• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Implement Code (0041-03 to 0600-04) Troubleshooting Procedures - Continued.
Table 1. Implement Code (0041-03 to 0600-04) Troubleshooting Procedures - Continued.

Maintenance Manual For Motorized Road Grader Model 120M - 2
Page Navigation
  516    517    518    519    520  521  522    523    524    525    526  
img
TM 5-3805-293-23-2
0026
Table 1. Implement Code (0041-03 to 0600-04) Troubleshooting Procedures - Continued.
CDI FMI CODE
TEST OR INSPECTION
CORRECTIVE ACTION
0490-04 Implement Lock Out
System Response:
Switch Voltage Below Nor-
ECM will log a diagnostic code.
mal
N OT E
Always inspect the harness connectorsthat are involved in the circuit.
Poor connections can often be the cause of a problem in an electrical
circuit. Verify that all connections in the circuit are clean and secure,
and that all connections are in good condition. If a problem with a con-
nection is found, correct the problem and verify that this diagnostic code
is Active before performing this procedure.
Perform open or short circuit test ateach harness connection to identify
correct harness to replace.
Perform this test only if condition is active.
Test Step 1. Verify if Code 0490-04
is Active.
1. Connect MSD (WP 0006). Select  0490-04 Code Active - Proceed to
Implement 120M and verify 0490- Test Step 2.
04 is active.
0490-04 Code Not Active -
Troubleshooting complete.
Test Step 2. Test for Faulty Imple-
ment Lock Out Switch.
1. Turn ignition switch and battery
disconnect switch to the OFF
position.
2. Disconnect the cab lower wiring
harness connector P-C94 (WP
0009, Figure 207) from implement
lockout switch (WP 0009, Figure
216) (WP 0272).
3. With the implement lockout switch
Continuity - Proceed to step 4.
in the unlock position (TM 5-3805-
No Continuity - Replace implement
293-10), using digital multimeter,
lockout switch (WP 0268 01).
measure for continuity between
Proceed to step 5.
implement lockout switch (WP
0009, Figure 207) terminal 4 and
terminal 5.
There should be continuity.
4. With the implement lockout switch
Continuity - Proceed to Test Step 3.
in the lock position (TM 5-3805-
No Continuity - Replace implement
293-10), using digital multimeter,
lockout switch (WP 0268 01).
measure for continuity between
Proceed to step 5.
implement lockout switch (WP
0009, Figure 207) terminal 5 and
terminal 6.
There should be continuity.
0026-60


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.