ENGINEDISASSEMBLY AND ASSEMBLYTM 5-3805-263-14&P-2ENGINE7. Install fuel lines (11) to the fuel injection pump.install fuel line (9) to the fuel filter.8Put clips (10) in position and install bolt to holdit on the oil filler tube.9. Put air compressor line clip (14) in position onthe flywheel housing and install bolt to holdclip in place.10. Connect two transmission oil lines (13) on thetransmission oil cooler.11. Connect air compressor line (16) to fitting andoil pressure line to cylinder block fitting (12).12. Install three wires (15) from harness on switch.13. Put two clips (I 9) used to hold two hose assem-blies in position and install bolts to hold them.14. Put tube (17) in position on the machine. In-stall the hoses (21) and theclamps (18) on eachend of the tube.15. Install clip (20) in position on the bottom of thefuel tank.16. Install wire on the water temperature switch(25).17.18.Install support (22) on cylinder head and installthe water temperature gauge sending unit (23)in the cylinder head.Connect hose assembly (24) to the air compres-sor.1-186
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business