TM 5-3805-261-34ENGINE MAINTENANCE.3-4.Engine.(Sheet 7 of 13)REMOVALWARNINGWeight of engine isapproximately 1500 pounds.Use adequate hoist and slingfor lifting. Failure tofollow this procedure maycause INJURY. If you areinjured, seek medical aidimmediately.37.Attach hoist and sling to bothlifting eyes mounted on each endof cylinder head and take upslack.38.Remove four bolts (62) and lockwashers (63) from trunnion onlower front, left and right sidesof engine and separate.CAUTIONClear all hose, cable, wiresand other detached assembliesfrom engine area beforelifting engine from frame.39.Remove engine. Lift engineslowly, always checking to besure cables and hoses are notcaught on anything. Do not allowengine to swing.40.Support on engine stand orsuitable blocking.NOTEIf engine supports interfereswith mounting, refer toparagraph 3-5, steps 3through 6 for removal.41.Remove hoist and sling.Go to Sheet 83-23
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business