TM 5-3805-261-34
EARTHMOVING EQUIPMENT COMPONENTS MAINTENANCE. (cont.)
12-3. Blade Lift Bar Assembly. (Sheet 1 of 6)
This task covers:
a.
Removal
b.
Disassembly
c.
Cleaning
d.
Inspection
e.
Assembly
f.
Installation
INITIAL SETUP
Applicable Configurations
Personnel Required
All
Construction equipment
repairer MOS 62B
Tools
General Mechanics Tool Kit:
References
Automotive (NSN 5180-00-
TM 5-3805-261-10
177-7033)
TM 5-3805-261-20
Two hoist and slings
Pulling adapter 1lP1834
Special Environmental Conditions
Stud 9S5558
None
Nut 1P544
Washer 3H467
General Safety Instructions
Puller assembly 5H9817
None
Pump group 5P3100
Torques
Test Equipment
All fasteners are tightened to
None
standard torques. Refer to
Appendix E.
Materials/Parts
Dry cleaning solvent,
Item 15, Appendix C
Clean cloths, Item 41,
Appendix C
Seals, Items 27, 29
Bearings, Items 28, 31, 33
Troubleshooting References
None
Equipment Condition
TM 5-3805-261-10
Vehicle parked on level ground.
Parking/emergency brake applied.
Equipment lowered to the ground.
Engine stopped.
Master disconnect switch off.
TM 5-3805-261-20
Centershift lock assembly removed.
Go to Sheet 2
12-8