TM 5-3805-261-34HYDRAULIC SYSTEM MAINTENANCE. (cont)10-23.OilCoolertoReliefValveandHydraulicTankLinesandFittings.(Sheet 9 of 9)INSTALLATION (cont)27. Install new preformed packing(19) and connector (18, Figure10-167).28. Install new preformed packing(17) and connector (16).29. Install new preformed packing(15) and connector (14).30. Install new preformed packing(13) and connector (12).31. Connect hose assemblies (72, 69,22 and 11).32. Install new seal (10), stem (9),flange (8) and four bolts (7,Figure 10-166).33. Install new seal (6), hose (5),flange (4) and three bolts (3).34. Install two clamps (2) and hose(1).NOTEReturn 130G Grader tooriginal equipment condition.Figure 10-167.Figure 10-166.Endof Task10-144
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business