TM 5-3805-261-34
HYDRAULIC SYSTEM MAINTENANCE. (cont)
10-23.
Oil Cooler to Relief Valve and Hydraulic Tank Lines and Fittings.
(Sheet 7 of 9)
INSTALLATION (cont)
7.
Install new preformed packing
(66) and connector (65).
8.
Install new preformed packing
(64) and connector (63).
9.
Install new preformed packing
(62) and connector (61).
10. Install hose assemblies (60, 59
and 58).
11. Install clamp (57), plate (56),
clip (55, Figure 10-175).
12. Install two washers (54) and nuts
(53).
13. Install clip (52), washer (51)
and bolt (50, Figure 10-174).
14. Install clamp (49), plate (48)
and clip (47, Figure 10-173).
15. Install two washers (46) and nuts
(45).
16. Install clip (44), washer (43)
and bolt (42, Figure 10-172).
10-142
Go to Sheet 8
Figure 10-176.
Figure 10-175.
Figure 10-173.
Figure 10-174.
Figure 10-172.