REAR AXLE MAINTENANCE. (cont)
5-22.
Drive Sprockets. (Sheet 3 of 3)
The following procedure must
be used to put the correct
amount of preload on the
final drive bearings.
2.
Install drive shaft. Refer to
paragraph 5-21.
3.
Using spanner socket, install nut
(1) and tighten to 100 ft-lb
torque.
4.
Turn sprockets (3 and 2) to put
bearings in their seats.
5.
Using large punch and hammer, hit
hub of sprockets (3 and 2).
Repeat steps 2, 3 and 4 until nut
(1) does not turn when tightened.
6.
Loosen nut (1).
7.
Tighten nut (1) to 50 ft-lb
torque.
8.
Position retainer (4) over nut
(1, Figure 5-124).
9.
Check alinement of mount bolt
holes. Retainer (4) bolt holes
must line up with sprockets (3
and 2) bolt holes.
10.
Tighten nut (1), if necessary,
until mounting bolts can be
installed.
11.
Install five locks (6) and bolts
(5).
NOTE
Return 130G Grader to
original equipment condition.
CAUTION
Figure 5-123.
Figure 5-124.
End of Task