TM 5-3805-261-34STARTING SYSTEM MAINTENANCE. (cont)4-11.StartingMotor(Prestolite). (Sheet 3 of 9)DISASSEMBLY (cont)9.Remove two plugs (19) and pin(20, Figure 4-63).10.Remove bolt (21) and preformedpackings (22 and 23). Discardpreformed packings (22 and 23).11.Remove bearing (24).NOTEHead and housing must bematchmarked before separationto aid in assembly.12.Using scriber, matchmark head(26) and housing (36).13.Remove three bolts (25).14.Remove head (26) from items 27thru 36 as an assembly.15.Remove washer (27, Figure 4-64).16.Remove and discard preformedpacking (28).17.Remove yoke (29), drive (30) andwasher (31).18.Remove plug (32), wick (33) andplug (34).19.Using brass driver and hammer,remove bearing (35).20.Remove armature (37), washers (38and 39) and two washers (40,Figure 4-65).21.Remove spacer (41) and washer(42).22.Remove items 43 thru 47 as anassembly.Go to Sheet 44-58Figure 4-63.Figure 4-64.Figure 4-65.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business