TM 5-3805-261-34
STARTING SYSTEM MAINTENANCE.
4-10.
Starting Motor Solenoid (Prestolite). (Sheet 4 of 4)
ASSEMBLY
9.
Install insulator (11), terminal
(10) and two studs (9) on cover
(12, Figure 4-58).
10.
Coat two spacers (8) with
Glyptal.
11.
Install two spacers (8), washers
(7), lockwashers (6), washers (5)
and nuts (4).
12.
Position items 12 thru 4 as an
assembly on housing (20, Figure
4-57).
13.
Connect wire assembly (3).
14.
Install screw (2).
15.
Install four nuts (1).
NOTE
Return 130G Grader to
original equipment condition.
Figure 4-57.
End of Task
4-55
Figure 4-58.