TM 5-3805-261-34ENGINE MAINTENANCE.3-11. FlywheelandFlywheelHousing. (Sheet 2 of 5)REMOVAL1.Remove plugs (1 and 2, Figure 3-41) from rearof engine.2.Using scriber, matchmark flywheel assembly(4) and crankshaft at same location.3.Install FT120 lifting bracket and 3/8-16-2BTHD bolt on flywheel assembly (4).WARNINGWeight of flywheel assembly is approximately 120pounds. Use adequate hoist and sling for lifting.Failure to follow this procedure may causeINJURY. If you are injured, seek medical aidimmediately.4.Attach hoist and sling to FT120 lifting bracket.5.Remove nine bolts (3).6.Remove flywheel assembly (4).7.Remove hoist and sling and FT120 liftingbracket.Go to Sheet 33-61Figure 3-41.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business