TM 5-3805-261-34ENGINE MAINTENANCE.3-11. FlywheelandFlywheelHousing.(Sheet 4 of 5 )INSTALLATION1. Position new gasket (7, Figure 3-42) on rear ofengine block. Use gasket cement to hold newgasket (7) in place.2. Install FT121 lifting bracket and 3/8-16-2BTHD bolt on flywheel housing (6).3. Attach hoist and sling to FT121 lifting bracket.4. Install two 1/2-13NC guide bolts (Figure 3-43).5. Using hoist and sling, position flywheelhousing (6) on guide bolts.6. Install 11 of 13 bolts (5).7. Remove two 1/2-13NC guide bolts.8. Install remaining two of 13 bolts (5).9. Tighten 13 bolts (5, Figure 3-44) in sequence,to 75 ft-lb torque.10. Trim new gasket (7) even with bottom ofcylinder block and flywheel housing (6, Figure3-42).11. Remove hoist and sling and FT121 liftingbracket.Go to Sheet 53-63Figure 3-44.Figure 3-43.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business