TM 5-3805-261-34
ENGINE MAINTENANCE.
3-9. Cylinder Head Assembly. (Sheet 6 of 8)
ASSEMBLY
1.
Position 12 new directors (37, Figure 3-37).
Aline notch in directors (37) with V stamped on
bottom, at the edge of the bore for 12 new
directors (37). Install 0.031 inch below surface
of cylinder head (18).
2.
Reduce temperature of eight new plugs (36)
and four new plugs (35 and 34) and using
suitable driver and hammer, install.
3.
Install three plugs (33).
4.
Install plate (32), two washers (31) and bolts
(30).
5.
Install plate (29), two washers (28) and bolts
(27).
6.
Install new gasket (26), cover (25), four
washers (24) and bolts (23).
INSTALLATION
1.
Position 12 new seals (22), four new seals
(21) and new preformed packing (20, Figure 3-
37) on machined spacer plate.
2.
Install new gasket (19) over spacer plate on
dowels in block.
3.
Install hoist and sling.
4.
Using hoist and sling, position items 37 thru 18
as an assembly over engine. Aline with
dowels in block and install.
Go to Sheet 7
3-55
Figure 3-37.