Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
ENGINE MAINTENANCE. (cont) - TM-5-3805-261-34_117
ENGINE MAINTENANCE. (cont) - TM-5-3805-261-34_119
TM-5-3805-261-34 Grader Heavy Road Motorized (Caterpillar Model 130 G) Manual
Page Navigation
68
69
70
71
72
73
74
75
76
77
78
TM 5-3805-261-34
ENGINE MAINTENANCE
.
(cont)
3-7.
Timing
Gears
and
Plate
. (Sheet 9 of 9)
INSTALLATION (cont)
35.
Install 3/8-16NC bolt into
flywheel again.
36.
If flywheel bolt is installed and
pin is in groove of pump
camshaft, the
gears
timing is
correct. If so, go to next step.
If not, repeat steps 30 thru 36.
37.
Remove 3/8-16NC bolt from
flywheel.
38.
Install plug (19, Figure 3-30).
39.
Install new gasket
(23), cover
(22), four washers (21) and bolts
(20, Figure 3-31) on fuel injec-
tion pump housing.
Torque
bolts
to 20
+
5 ft-lb.
40.
Position breather (18, Figure
3-29) on valve cover.
41.
Tighten two clamps (15).
42.
Install bolt (16) and tighten to
10
+
2 ft-lb
torque
.
NOTE
Return 130G Grader to
original equipment condition.
End of Task
Figure 3-31.
Figure 3-30.
Figure 3-29.
3-46
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business