TM 5-3805-261-34FRAME MAINTENANCE. (cont)16-3. ArticulationHitchBearing.(Sheet 6 of 7)INSTALLATION(cont)10. Install items 10 thru 8 as anassembly (Figure 16-30) in lowerpin bore by raising floor jack.11. Using clean grease, lubricate newseal (6, Figure 16-34) andposition with lip facing down oncap (5).12. Using suitable drive plates andhammer, install new seal (6) oncap (5).13. Position items 6 and 5 as anassembly over bearing (8, Figure16-31) on top of lower pin boreof front frame.14. Install three of seven lock-washers (4) and three of sevenbolts (3), with one but no morethan two holes between threebolts (3). Tighten three ofseven bolts (3) to 65 ft-lbtorque.15. Insert feeler gage between cap(5) and front frame near each ofthree of seven bolts (3) andmeasure gap between cap (5,Figure 16-32) and front frame.16. Remove three of seven bolts (3),lockwashers (4) and items 6 and 5as an assembly (Figure 16-31).Go to Sheet 716-20Figure 16-32.Figure 16-31.Figure 16-30.Figure 16-34.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business