• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GOVERNOR CONTROLS MAINTENANCE - CONTINUED
GOVERNOR CONTROLS MAINTENANCE - CONTINUED

Maintenance Manual For Grader, Road, Motorized, Diesel Engine Driven, Heavy, Commercial Construction Equipment
Page Navigation
  96    97    98    99    100  101  102    103    104    105    106  
img
TM 5-3805-261-23-2
GOVERNOR CONTROLS MAINTENANCE - CONTINUED
0282 00
INSTALLATION - CONTINUED
67.
Align fuel injection pump governor shaft (13) and
13
17
lever (15) with matchmarks on fuel injection pump
governor (17).
68.
Install bolt (16) and nut (14).
14
15
16
397-1420
69.
Install nut (9), rod end (6), nut (12), and rod (11)
loosely on link (10).
10
9
6
11
397-1419
12
70.
Position rod assembly (4).
1
NOTE
Do not bend back two cotter pins at this
time.
3
71.
Install pin (3) and new cotter pin (2) to rod assembly
(4) and lever (1).
2
72.
Install rod end (6) to rod assembly (4) and lever (8).
4
8
397-1418
6
0282 00-22


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.