TM 5-3805-261-23-2
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Conditions
Maintenance Level
Direct Support
Machine parked on level ground (TM 5-3805-261-
10)
Tools and Special Tools
Tool kit, general mechanic's (Item 89, WP 0348 00)
Parking/emergency brake applied (TM 5-3805-261-
10)
Shop equipment, field maintenance (Item 74, WP
Implements lowered to ground (TM 5-3805-261-
Wrench, torque (Item 96, WP 0348 00)
10)
Materials/Parts
Antiseize compound (Item 6, WP 0349 00)
Battery disconnect switch in OFF position (TM 5-
3805-261-10)
Gasket (4)
References
WP 0020 00
Fuel injection lines removed (WP 0035 00)
WP 0046 00
REMOVAL
NOTE
For models 130GS and 130GNS, disconnect primary fuel/priming pump as necessary (WP 0046 00) and lay aside.
1.
Remove two bolts (7), washers (6), and shield (5)
from top-right of engine.
12
2.
Remove four nuts (8), washers (9), two brackets (4)
11
and four washers (12).
10
3.
Remove four nuts (10), washer (2), nut (3), and three
9
washers (11).
8
2
3
4
5
6
7
397-1339