TM 5-3805-261-20
HYDRAULIC SYSTEM MAINTENANCE.
15-10.
Sideshift Check and Relief Valve. (Sheet 3 of 4)
CLEANING
Clean all parts. Refer to Chapter 2.
INSPECTION
Inspect all parts. Refer to Chapter 2.
INSTALLATION
1.
Install valve assembly (19), washer (18) and
bolt (17, Figure 15-13).
2.
Install new preformed packing (16) and
connector (15).
3
Install new preformed packing (14) and
connector (13).
4.
Connect hose assemblies (12 and 11) on
bottom valve ports.
5.
Install new preformed packing (10) and
elbow (9, Figure 15-12).
6.
Install new preformed packing (8) and elbow
(7).
7.
Connect hose assemblies (6 and 5) on top
valve ports.
Go to Sheet 4
15-31