TM 5-3805-261-20HYDRAULIC SYSTEM MAINTENANCE. (cont)15-9.LeaningWheelCheckValve.(Sheet 4 of 4)INSTALLATION (cont)5.Install new preformed packing (10) andelbow (9, Figure 15-10).6.Install new preformed packing (8) andelbow (7).7.Connect hose assemblies (6 and 5).WARNINGOnly a qualified operator mayperform the next procedure. All otherpersonnel must clear the immediatearea. Failure to follow this proceduremay cause INJURY. If you areinjured, seek medical aidimmediately.8.Start engine. Refer to TM 5-3805-261-10.9.Operate leaning wheel control lever. Movesystem through at least five full movementsof travel to bleed air from system.10.Stop engine.11.Inspect hose assemblies and connectionsfor leaks.12.Refill hydraulic tank to proper level. Referto LO 5-3805-261-12.13.Install frame cover (4), nine washers (3 and2) and bolts (1) in front, right side of frame.NOTEReturn 130CG Grader to originalequipment condition.Figure 15-10.End of Task15-28
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business