TM 5-3805-261-20
FUEL SYSTEM MAINTENANCE. (cont)
6-20.
Turbocharger. (Sheet 3 of 3)
INSTALLATION
1.
Install hose (11) on pipe (12, Figure 6-51)
on top, right side of engine.
2.
Install two clamps (10).
3.
Install elbow (9), hose (8) and two clamps
(7).
4.
Install new gasket (6) and turbocharger (5).
Slide turbocharger (5) into hose (11, Figure
6-50).
5.
Coat threads of nut (4), bolt (3), three bolts
(2) and nuts (1) with anti-seize compound
and install. Tighten bolts (3 and 2) to 40 ft-
lb torque.
NOTE
Return
130G
Grader
to
original
equipment condition.
Figure 6-51.
Figure 6-50.
Figure 6-49.
End of Task
6-72