TM 5-3805-261-20FUEL SYSTEM MAINTENANCE. (cont)6-20.Turbocharger.(Sheet 3 of 3)INSTALLATION1.Install hose (11) on pipe (12, Figure 6-51)on top, right side of engine.2.Install two clamps (10).3.Install elbow (9), hose (8) and two clamps(7).4.Install new gasket (6) and turbocharger (5).Slide turbocharger (5) into hose (11, Figure6-50).5.Coat threads of nut (4), bolt (3), three bolts(2) and nuts (1) with anti-seize compoundand install. Tighten bolts (3 and 2) to 40 ft-lb torque.NOTEReturn 130G Grader to originalequipment condition.Figure 6-51.Figure 6-50.Figure 6-49.End of Task6-72
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business