TM 5-3805-261-20FUEL SYSTEM MAINTENANCE. (cont.)6-19.TurbochargerAirLines.(Sheet 3 of 4)REMOVAL(cont.)11.Remove six nuts (10, Figure 6-48)from right side of air cleaner.12.Loosen two clamps (13).13.Remove pipe (11) and gasket (12)from turbocharger. Discard gasket(12). Remove all gasket material frommounting surfaces.14.Remove two clamps (13) and hose(14).CLEANINGClean all parts. Refer to Chapter 2.INSPECTIONInspect all parts. Refer to Chapter 2.INSTALLATION1.Install hose (14, Figure 6-48) inturbocharger.2.Install two clamps (13).3.Install new gasket (12) and pipe (11)on air cleaner.4.Install six nuts (10). Tighten six nuts(10) to 20 ft-lb torque.5.Tighten two clamps (13).Figure 6-48.Go to Sheet 46-68
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business