TM 5-3805-261-20
FUEL SYSTEM MAINTENANCE. (cont.)
6-19.
Turbocharger Air Lines. (Sheet 3 of 4)
REMOVAL (cont.)
11.
Remove six nuts (10, Figure 6-48)
from right side of air cleaner.
12.
Loosen two clamps (13).
13.
Remove pipe (11) and gasket (12)
from turbocharger. Discard gasket
(12). Remove all gasket material from
mounting surfaces.
14.
Remove two clamps (13) and hose
(14).
CLEANING
Clean all parts. Refer to Chapter 2.
INSPECTION
Inspect all parts. Refer to Chapter 2.
INSTALLATION
1.
Install hose (14,
Figure
6-48)
in
turbocharger.
2.
Install two clamps (13).
3.
Install new gasket (12) and pipe (11)
on air cleaner.
4.
Install six nuts (10). Tighten six nuts
(10) to 20 ft-lb torque.
5.
Tighten two clamps (13).
Figure 6-48.
Go to Sheet 4
6-68