TM 5-3805-261-20HYDRAULIC SYSTEM MAINTENANCE.15-25.BladeTipLines,FittingsandHoses.(Sheet 10 of 10)INSTALLATION24.Install two new preformed packings (2) andelbows (1, Figure 15-94) to control valvegroup (second assembly from outside)under front, left side of cab.25.Connect two hose assemblies (23, Figure15-93).WARNINGOnly a qualified operator mayperform the next procedure. All otherpersonnel must clear the immediatearea. Failure to follow this proceduremay cause INJURY. If you areinjured, seek medical aidimmediately.26.Start engine. Refer to TM 5-3805-261-10.27.Operate blade tip control. Move systemthrough at least five full movements oftravel to bleed air from the system.28.Stop engine.29.Inspect hose assemblies and connectionsfor leaks.30.Refill hydraulic tank to proper level. Referto LO 5-3805-261-12.NOTEReturn 130G Grader to originalequipment condition.Figure 15-94.Figure 15-93.End of Task15-135
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business