TM 5-3805-293-23-4
0256
INSTALLATION CONTINUED
000256
15. Install new O-ring (Figure 11, Item 4) and connect hose (Figure 11, Item 5) to tube (Figure 11, Item 3).
16. Install new O-ring (Figure 11, Item 1) and connect hose (Figure 11, Item 6) to elbow (Figure 11, Item 2).
17. Install bolt (Figure 11, Item 10), two clamps (Figure 11, Item 7), washer (Figure 11, Item 8) and nut (Figure 11,
Item 9) on two hoses (Figure 11, Items 6 and 5).
Figure 11. Left-Side Articulation Cylinder.
0256
END OF TASK
FOLLOW-ON TASKS
000256
1. Install fuel tanks (WP 0229).
END OF TASK
END OF WORK PACKAGE