• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Test in Progress.
FUEL TRANSFER PUMP TEST

Maintenance Manual For Motorized Road Grader Model 120M - 2
Page Navigation
  1151    1152    1153    1154    1155  1156  1157    1158    1159    1160    1161  
img
.
TM 5-3805-293-23-2
0035
FUEL SYSTEM VERIFICATION TEST CONTINUED
00035
9. When Fuel System Verification Test is finished, select the OK button (Figure 12, Item 2) on Test Complete
popup window (Figure 12, Item 1).
a. If all injectors display Success, test is complete.
b. If any injector does not display Success, perform the Fuel System Verification Test again by selecting the
Restart button (Figure 12, Item 3).
c.
If any injector still does not display Success, return to troubleshooting.
Figure 12. Test Complete.
0035
END OF TASK
0035-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.