TM 5-3805-261-34ENGINE MAINTENANCE.13-2. CylinderBlockandLiners.(Sheet 7 of 7)INSTALLATION16. Install new cup plug (19, Figure 13-2).17. Install new washer (18) and plugs (17 thru 14).18. Using collet and camshaft bearing installation group, install bearing (13) and two bearings (12). Oil holesin bearings must match oil holes in cylinder block with cinch butt joint above horizontal center line. Front bearing must be0.00 to 0.20 inch from front face. Center bearing must be 11.917 to 11.957 inches from front face. Rear bearing must be23.794 to 23.834 inches from front face.19. Install two dowels (11).20. Install new cup plug (10), stud (9) and dowel (8, Figure 13-1).21. Install dowels (7 and 6), pin (5) and plug (4).22. Install new gasket (3), new preformed packing (2) and plate (1).NOTEReturn 130G Grader to original equipment condition.Figure 13-2.Figure 13-1.End of Task13-9
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business