TM 5-3805-261-34
ENGINE MAINTENANCE. (cont)
13-2.
Cylinder Block and Liners. (Sheet 6 of 7)
INSTALLATION (cont)
8.
Remove four cylinder liners (26) and apply liquid soap to 12 new preformed packings (25, Figure 13-4)
grooves.
9.
Install 12 new preformed packings (25) in cylinder liners (26).
10.
Using oil, soak four bands (24) for 30 seconds and install.
11.
Install items 26 thru 24 as an assembly in block (28). Four cylinder liners (26) must be installed quickly
after bands (24) are installed before bands (24) swell. Use liner installer group to push items 26 thru 24 as an assembly to
depth in block (28, Figure 13-3).
12.
Recheck projection. Refer to paragraph 3-7.
13.
Install four new orifices (23).
14.
Check opening inside diameter which should be 0.093 to 0.097 inch.
15.
Install five balls (22), plug (21) and two plugs (20).
Figure 13-3.
Figure 13-4.
Go to Sheet 7
13-8